I-95 Resurfacing
Hopkinton, Richmond, RI
Resurfacing of over 40 miles of I‑95 from the Connecticut state line to Baker Pines Bridge including micro‑milling, asphalt placement, drainage work, and traffic control.
View Project
Route 146
North Smithfield, RI
Major corridor improvement project replacing bridges, repaving roadways, and reconfiguring interchanges along the Route 146 corridor.
View Project
Lafayette Road Bridge
North Kingstown, RI
First lateral slide bridge replacement in RI, Accelerated completion in two weekend closures, Over 300,000 pounds of structural steel & rebar installed.
View Project
Warwick Corridor
Warwick, RI
Design‑build project replacing bridges over I‑95 and I‑295 and improving intersections, drainage, sidewalks, and roadway infrastructure.
View Project
Slater Mill Dam
Pawtucket, RI
Historic dam repair on the Blackstone River including cofferdams, tremie concrete breach repair, impermeable liner installation, and articulated concrete block protection.
View Project
Route 12 Reconstruction Including Bridge Replacement
Sterling, Leominster, MA
Full roadway reconstruction and bridge replacement project including drainage, traffic signals, roundabout construction, utilities relocation, and paving.
View Project
Route 140 Resurfacing & Related Work
Grafton, Upton, MA
Roadway resurfacing project including milling, paving, bridge repairs, drainage improvements, signage, and pavement markings.
View Project
Massachusetts Turnpike (I‑90) Maintenance
Auburn, Charlton, Oxford, Sturbridge, MA
Maintenance and resurfacing work including milling, paving, bridge repairs, drainage work, guardrail installation, and traffic control.
View Project
Bridge Group 01
Providence, RI
Rehabilitation of five bridges along I-95 Corridor, Substantial concrete deck repairs, structural steel repairs, and joint replacement, Significant scope additions with project completed on original timeline.
View Project
Macomber Stadium
Central Falls, RI
Construction of a synthetic turf athletic field and stormwater infrastructure including contaminated soil remediation and underground infiltration system.
View Project
Pell Bridge Ramps Phase I & II
Newport, RI
Connectivity for pedestrians and bicyclists and provided park & ride transit opportunity, Bridge demolition and rehabilitation, ROW, utilities, ITS, stormwater, wetland, contaminated soil.
View Project
Silver Spring Lake Dam
North Kingstown, RI
Repair of dam impounding the Mattatuxet River including cofferdam installation, low‑level outlet construction, culvert installation, and riprap channel work.
View Project
Tiverton Landfill Closure
Tiverton, RI
Closure and capping of a 40‑acre landfill including geotextile installation, gas ventilation system, stormwater controls, and conversion to green open space.
View Project
Wyoming Upper Reservoir Dam
Richmond, Hopkinton, RI
Dam rehabilitation project restoring the structure to safe status with cofferdams, spillway reconstruction, sluiceway gate installation, and embankment improvements.
View Project
Boston Neck Road & South County Trail
Statewide, RI
Pavement resurfacing and roadway improvements along Route 1A and Route 2 including micromilling, resurfacing, sidewalks, ADA ramps, signals, and drainage upgrades.
View Project