{"id":5172,"date":"2023-03-21T11:58:38","date_gmt":"2023-03-21T11:58:38","guid":{"rendered":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/?post_type=project&#038;p=5172"},"modified":"2024-03-28T14:16:46","modified_gmt":"2024-03-28T19:16:46","slug":"brookline-high-school-expansion","status":"publish","type":"project","link":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/","title":{"rendered":"Brookline High School Expansion"},"content":{"rendered":"<p>The expansion project at Brookline High School consisted of the construction and renovation of multiple buildings across the school campus. In phase one of the project, a new STEM Wing was added to the historic main building including new biology and chemistry classrooms, a maker space, culinary arts facilities, and administrative spaces. In addition to the structural design of the new building, LeMessurier worked with the construction team to engineer a site-enabling solution that allowed for demolition of the existing Roberts Wing while maintaining in-service utilities contained within the existing basement and tunnel structures.<\/p>\n<p>The second phase of the project, a new academic building at 22 Tappan Street was constructed occupying the space bounded by Tappan Street, Cypress Street, and Brington Road. This building spans over the MBTA\u2019s Green Line tracks so that its entrance can face the heart of the school campus at Cypress Field. Isolation pads were integrated into the structure so that train vibrations would neither be felt nor heard by students. Building technologies developed for accelerated bridge construction, such as voided slabs and \u201cNEXT\u201d beams, were used to minimize disruption to train service. The five-story, 120,000-square-foot building serves 700 students with general classrooms, physics labs, special education suites, a library, a cafeteria, and a white box theatre.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The expansion project at Brookline High School consisted of the construction and renovation of multiple buildings across the school campus. In phase one of the project, a new STEM Wing was added to the historic main building including new biology and chemistry classrooms, a maker space, culinary arts facilities, and administrative spaces. In addition to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5353,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"class_list":["post-5172","project","type-project","status-publish","has-post-thumbnail","hentry","type-civic","type-k-12-education","expertise-transit-oriented-design","expertise-air-rights","expertise-construction-logistics"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Brookline High School Expansion - LeMessurier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Brookline High School Expansion - LeMessurier\" \/>\n<meta property=\"og:description\" content=\"The expansion project at Brookline High School consisted of the construction and renovation of multiple buildings across the school campus. In phase one of the project, a new STEM Wing was added to the historic main building including new biology and chemistry classrooms, a maker space, culinary arts facilities, and administrative spaces. In addition to [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/\" \/>\n<meta property=\"og:site_name\" content=\"LeMessurier\" \/>\n<meta property=\"article:modified_time\" content=\"2024-03-28T19:16:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-content\/uploads\/2023\/03\/brooklinehighschool-STEM-02.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/\",\"url\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/\",\"name\":\"Brookline High School Expansion - LeMessurier\",\"isPartOf\":{\"@id\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-content\/uploads\/2023\/03\/brooklinehighschool-STEM-02.jpg\",\"datePublished\":\"2023-03-21T11:58:38+00:00\",\"dateModified\":\"2024-03-28T19:16:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/#primaryimage\",\"url\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-content\/uploads\/2023\/03\/brooklinehighschool-STEM-02.jpg\",\"contentUrl\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-content\/uploads\/2023\/03\/brooklinehighschool-STEM-02.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"brooklinehighschool-STEM-02\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Brookline High School Expansion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/#website\",\"url\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/\",\"name\":\"LeMessurier\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Brookline High School Expansion - LeMessurier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/","og_locale":"en_US","og_type":"article","og_title":"Brookline High School Expansion - LeMessurier","og_description":"The expansion project at Brookline High School consisted of the construction and renovation of multiple buildings across the school campus. In phase one of the project, a new STEM Wing was added to the historic main building including new biology and chemistry classrooms, a maker space, culinary arts facilities, and administrative spaces. In addition to [&hellip;]","og_url":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/","og_site_name":"LeMessurier","article_modified_time":"2024-03-28T19:16:46+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-content\/uploads\/2023\/03\/brooklinehighschool-STEM-02.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/","url":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/","name":"Brookline High School Expansion - LeMessurier","isPartOf":{"@id":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/#website"},"primaryImageOfPage":{"@id":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/#primaryimage"},"image":{"@id":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/#primaryimage"},"thumbnailUrl":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-content\/uploads\/2023\/03\/brooklinehighschool-STEM-02.jpg","datePublished":"2023-03-21T11:58:38+00:00","dateModified":"2024-03-28T19:16:46+00:00","breadcrumb":{"@id":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/#primaryimage","url":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-content\/uploads\/2023\/03\/brooklinehighschool-STEM-02.jpg","contentUrl":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-content\/uploads\/2023\/03\/brooklinehighschool-STEM-02.jpg","width":1920,"height":1080,"caption":"brooklinehighschool-STEM-02"},{"@type":"BreadcrumbList","@id":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/brookline-high-school-expansion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/project\/"},{"@type":"ListItem","position":3,"name":"Brookline High School Expansion"}]},{"@type":"WebSite","@id":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/#website","url":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/","name":"LeMessurier","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-json\/wp\/v2\/project\/5172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-json\/wp\/v2\/comments?post=5172"}],"version-history":[{"count":9,"href":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-json\/wp\/v2\/project\/5172\/revisions"}],"predecessor-version":[{"id":6880,"href":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-json\/wp\/v2\/project\/5172\/revisions\/6880"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-json\/wp\/v2\/media\/5353"}],"wp:attachment":[{"href":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-json\/wp\/v2\/media?parent=5172"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-json\/wp\/v2\/project_category?post=5172"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/s2.designcostaging.com\/clients\/lemessurier_staging\/wp-json\/wp\/v2\/project_tag?post=5172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}